04 Gennaio 2011 Current constuction report Avatara Condominium, Mae Phim Beach.
• Building A:
• ° Tiling works on 2, 3, 4 and 5 floor almost complete.
• ° Tiling works on 6th floor ongoing.
• ° Door installation has started.
• ° Plastering works on 6th floor ongoing.
• ° Block works on 6th and 7th floor ongoing.
• ° Electrical and sanitary piping works follows the block works.
• Building B:
• ° Ground works completed.
• ° Pile cap foundation has started.
• ° Mobilization of more workers ..... >>>>>
|